Licensed · Bonded · Insured · BBB Accredited · FORTIFIED Roofing Contractor · Since 2022

ADU Builder

for Detached Cottages, Garage Conversions and Backyard Rental Units, Managed End-to-End by Your Dedicated Project Manager

Wise Builders Roofing and Renovations is a licensed, bonded, and insured ADU builder and accessory dwelling unit contractor serving Mobile County, Baldwin County, and the Mississippi Gulf Coast from offices in Theodore and Foley.

We design and build detached ADUs, backyard cottages and casitas, garage conversion ADUs, above-garage carriage houses, and junior ADUs, and we set and finish prefab ADUs on engineered foundations rated for coastal wind.

This page covers detached and converted units. If you want a suite attached to the house under the same roof, with a shared wall and a connecting door, that project is a mother-in-law suite, and we build those too.

Every ADU runs end to end through one dedicated project manager. One point of contact. One transparent fixed estimate. One firm timeline, with an update on every active work day. Call (251) 305-7282 for a free in-home design consultation.

★★★★★ 5.0 on Google · 160+ verified reviews · Free in-home consultation · Licensed, bonded & insured

Schedule a free analysis today

5.0Google rating
160+Verified reviews
100%Satisfaction guarantee
2022Serving the Gulf Coast since
Atlas Pro Certified VA SAH / SHA grant contractor FORTIFIED roofing contractor Design-build under one contract
What an ADU Is

What an ADU Builder Does, and Who Hires One

An accessory dwelling unit is a second, self-contained home on a single-family lot, with its own kitchen, bathroom, sleeping area, and private entrance. An ADU builder designs it, clears the zoning and permit path, brings utilities to it, and builds it to the same code as the main house.

The kitchen is what makes it a dwelling. Under both the City of Mobile and City of Foley definitions, permanent cooking facilities turn a shed, pool house, or garage into a legal dwelling unit, which triggers zoning review, a parking space, and utility capacity checks.

That is the line between a backyard office and a backyard cottage, and it is where most do-it-yourself ADU plans fall apart. We handle that line for you from the first site visit.

Who Builds an ADU on the Gulf Coast

The families who call us about ADU construction are usually solving one of a few problems. Most of them have owned their lot for years and would rather build on it than move.

  • Parents moving in from out of state who need their own kitchen, bath, and front door.
  • Homeowners near Mobile, Spanish Fort, or the beaches who want a long-term rental unit that pays part of the mortgage.
  • Adult children coming home after college or a divorce, with privacy on both sides.
  • Empty nesters planning to move into the cottage themselves and rent the main house later.
  • Veterans using VA SAH and SHA grants for a zero-step, roll-in accessible unit.
  • Owners of a detached garage or workshop that has never earned its footprint.
A home renovation by Wise Builders Roofing and Renovations in Mobile, Alabama
ADU Builder

Detached ADU vs Attached Mother-in-Law Suite

A detached ADU sits in its own building. An attached suite shares a wall and a roof with the main house. The difference matters more here than in most states.

Fairhope, for example, has historically classified an attached suite with a kitchen under a common roof as part of the principal dwelling, while limiting detached accessory structures to a half bath and no kitchen.

That steers many Eastern Shore families toward the attached path, which lives on our mother-in-law suite page.

Every other jurisdiction we serve treats a detached unit as its own animal, with its own size cap, setbacks, and parking rule. That is what the rest of this page is about.

★★★★★Google Review

"Nathan was timely and very communicative. Definitely listens, understands and is the most helpful and knowledgeable for your needs or project."

Jacob Cox, Google review, March 2026

Four accessory dwelling unit types built by Wise Builders Roofing and Renovations on the Alabama and Mississippi Gulf Coast, a detached backyard cottage on a raised slab, a two-car garage converted into a one-bedroom apartment, an above-garage carriage house with exterior stairs, and a junior ADU inside the main home, each with a separate private entrance and fiber-cement siding.
Four Types of ADU Construction
ADU Types

Four Types of ADU Construction We Build

ADU construction on the coast comes in four forms: a detached backyard cottage, a garage conversion, an above-garage carriage house, and a junior ADU carved out of the existing house. Each has a different cost, timeline, and zoning profile.

Detached ADU: Backyard Cottage and Casita

Press here to open

A detached ADU is a stand-alone cottage in the rear yard with no shared walls. It is the most private option, the most valuable at appraisal, and the one every ordinance regulates hardest.

As a backyard guest house builder and casita builder, we place the unit behind the front building line, inside the side and rear setbacks, off any recorded easement, and within the size percentage the jurisdiction allows.

Detached ADU Specs We Build To

  • Monolithic slab on high ground, or piers and pilings in a FEMA flood zone.
  • Continuous load path with hurricane straps from foundation to roof deck.
  • James Hardie fiber-cement lap siding and impact-rated windows.
  • Ductless mini-split with its own thermostat.
  • Tankless water heater and a dedicated 100-amp sub-panel.
  • Separate private entrance and one off-street parking space.

ADU Types Compared by Cost per Square Foot

Use this table to place your project. The Wise Builders ranges come from our addition pricing of $125 to $250 per square foot, adjusted for the reuse or engineering each type involves. National figures are from HomeGuide and are labeled as national.

ADU TypeWise Builders Range per Sq FtNational Benchmark (HomeGuide)What Drives the Number
Garage conversion ADU$95 to $175$50 to $200Existing slab and roof reused; egress, bath, kitchen, HVAC added
Junior ADU / interior conversion$110 to $190$60 to $200Interior only; efficiency kitchen, new exterior door, bath
Detached ADU (backyard cottage)$150 to $250$150 to $250Ground-up foundation, framing, roof, full utilities
Above-garage carriage house$200 to $300$200 to $500+Garage engineered for second floor and wind, stairs, roof tie-in
Prefab ADU (set and finish)$80 to $160 unit, plus site work$80 to $160 before site workFactory unit plus foundation, taps, and finish by a licensed builder
★★★★★Google Review

"Wise Builders stand by their work! My husband and I had a two car garage addition and patio added to our home by another contractor. We called Wise Builders to remediate the problem, and the owner Cody came out personally to check things out. We were very happy with the work. I would not hesitate to call Wise Builders again."

Jennifer Ross, Google review, June 2026

Zoning

ADU Rules by Jurisdiction on the Alabama and Mississippi Coast

ADU zoning on the Gulf Coast is decided city by city and district by district, not by the state. The same 800-square-foot cottage that is permitted by right in Mobile needs a variance in Fairhope and a Board of Adjustment hearing in Foley.

This is the part of ADU construction that stalls the most projects, so we check it before we draw anything. The table below is the version we use in the first consultation.

ADU Rules Comparison Table

JurisdictionADUs AllowedSize CapSetbacks and PlacementHeightParkingNotes
City of Mobile (UDC Sec. 64-4-2(B))By right, one per lot in R-A, R-1, R-21,000 sq ft or 50% of principal dwelling, whichever is lessNot in any recorded easement; accessory setbacks applyTwo stories or main house height, whichever is lessOne off-street spaceHistoric districts need ARB approval under 64-4-2(B)(5); converted structures to current code
Unincorporated Mobile CountyNo countywide zoningNone by zoningCovenants and easements onlyNone by zoningNone by zoningBuilding, electrical, plumbing, mechanical permits still required; ADPH septic on non-sewer lots
Baldwin County (zoned planning districts)By right in most districts60% of principal residence; District 21 capped at 1,200 sq ftRSF-E and RSF-1 ground coverage capped at 35% of lotDistrict rulesDistrict rulesDistricts 10 and 24 allow interior units only; District 15 defers to HOA covenants
City of FoleyYes, complete independent unit60% of principal residence; 30% of required yard10 ft from all lot lines and structures; no front or street-side yardTwo storiesOne spaceBoard of Adjustment and Appeals review adds a meeting cycle
City of FairhopeRestricted accessory structureHistorically 50% of principal structureAccessory setbacksAccessory rulesNot addressedHalf bath only, no kitchen, utilities through main house unless variance or updated ordinance
Gulfport, MSYes, rear yardUp to 1,000 sq ft10 ft rear, 5 ft sideNo taller than primaryPer districtExterior materials must match main house; Gulfport Urban Development
Biloxi, MS (LDO Article 23-4)Yes, detached800 sq ftRear yard; 10 ft rear, 5 ft side20 ftPer districtPermanent foundation required; no RVs or park models
Ocean Springs, MS (UDC 6.3)One internal, attached, or detached per homeScale standardsDesign standardsDesign standardsStandards applyRules on garages, occupancy, utilities
01

City of Mobile: ADUs by Right Under the UDC

Inside the Mobile city limits, the Unified Development Code permits one accessory dwelling unit per lot in the R-A, R-1, and R-2 districts as an accessory use. That means no rezoning and no variance for a conforming unit.

The cap is 1,000 square feet of gross floor area or 50% of the principal dwelling, whichever is smaller. A 1,600-square-foot ranch can carry an 800-square-foot cottage. A 2,400-square-foot house can carry the full 1,000.

Two rules catch homeowners off guard. The unit cannot sit in any recorded easement, so we pull a title survey early. And any house in a designated historic district needs Architectural Review Board approval before Build Mobile will issue the permit.

02

Unincorporated Mobile County: No Zoning, Still Permits

Theodore, Grand Bay, Wilmer, and the outskirts of Semmes have no countywide zoning use table. There is no ADU size cap and no setback ordinance to check, which is why so many of our detached cottages land there.

You still need building, electrical, plumbing, and mechanical permits and inspections from Mobile County Inspection Services. If the lot is on septic, the Alabama Department of Public Health sizes the system by bedroom count, and a one-bedroom cottage often means a larger tank or a longer field.

03

Baldwin County Planning Districts

Baldwin County permits accessory dwellings by right in most zoned planning districts, as long as the unit does not exceed 60% of the principal residence. The county then layers district-specific rules on top.

  • District 21 caps the accessory dwelling at 1,200 square feet.
  • Districts 10 and 24 require the unit to be inside the main dwelling, so only a junior ADU qualifies.
  • District 15 defers to homeowner association covenants, and many Daphne, Spanish Fort, and Fairhope subdivisions prohibit second dwellings outright.
  • RSF-E and RSF-1 districts cap total building coverage at 35% of the lot, which is often the real limit on a large lot with a pool and a shop.
04

Foley, Fairhope and the Mississippi Cities

Foley requires a complete, independent unit no larger than 60% of the principal residence, set 10 feet from every lot line and every other structure, with no placement in a front or street-side yard.

The unit may cover no more than 30% of the required yard and needs one parking space. Board of Adjustment and Appeals review adds a meeting cycle to the schedule.

Fairhope has long limited detached accessory structures to a half bath, no kitchen, and utilities through the main house. Unless the ordinance has been updated or a variance is granted, an attached suite is the realistic path there.

Gulfport allows rear-yard ADUs up to 1,000 square feet with matching exterior materials. Biloxi caps them at 800 square feet and 20 feet tall on a permanent foundation. Ocean Springs permits one internal, attached, or detached unit per home under UDC 6.3.

★★★★★Google Review

"The contract was clear and all work was performed on schedule. A certificate of compliance was issued by a third party after inspection. It is refreshing to find a company like this."

Ronald Houle, Google review, March 2024

How It Works

How Our ADU Builder Process Works, Step by Step

A good ADU builder gives you a site verdict before a price. We start every ADU with a free in-home design consultation and a walk of the lot, because the yard decides more about this project than the floor plan does.

From that visit you get a transparent, fixed estimate covering design, engineering, permits, utilities, and construction. You know what you are paying for and when each phase happens before any dirt moves.

Our Seven-Step ADU Construction Process

Seven steps take you from a backyard to a certificate of occupancy. Your project manager owns every one of them.

The Wise Builders Roofing and Renovations ADU construction process on the Gulf Coast, from site feasibility and title survey through sealed engineered plans, zoning and permit approval with Build Mobile or Baldwin County Building Inspection, utility taps, foundation, framing, and final walkthrough, all coordinated by one dedicated project manager. A Wise Builders Roofing and Renovations project manager measuring and documenting a Gulf Coast home before design work begins A printed Wise Builders Roofing and Renovations fixed estimate and written scope of work on a homeowner's table A Wise Builders Roofing and Renovations project manager holding approved permit paperwork and sealed drawings at a Gulf Coast jobsite A Wise Builders Roofing and Renovations project manager reviewing the approved permit and inspection schedule at a Gulf Coast jobsite A Wise Builders Roofing and Renovations home addition under construction in Baldwin County, Alabama A finished covered porch addition built by Wise Builders Roofing and Renovations in Baldwin County, Alabama
Step 1 of 7 · Free In-Home Consultation and Site Feasibility
1

Step 1. Free In-Home Consultation and Site Feasibility

We walk the lot, measure the main house, and check the four things that kill ADU projects: zoning district, HOA or deed covenants, FEMA flood zone, and where the sewer lateral or septic field actually runs.

2

Step 2. Title Survey and Easement Check

We order a current survey showing recorded easements, setbacks, and the rear building line. Mobile prohibits an ADU in any recorded easement, and a utility easement across the back ten feet of a lot is common in older subdivisions.

3

Step 3. Transparent Fixed Estimate

You receive scope, materials, allowances, and schedule in writing, with one firm number. Utility taps, impact fees, engineering, and permit fees are line items, not surprises.

4

Step 4. Design and Sealed Engineering

A residential designer draws the unit and a structural engineer seals the plans, showing the wind-load design, foundation, and flood elevation. Plan review in Mobile also confirms the unit meets the 2021 IRC as adopted in Alabama.

5

Step 5. ADU Permit and Zoning Approval

Inside Mobile we file with the Build Mobile Permitting and Inspections Division, adding ARB review in historic districts. Unincorporated lots go to Mobile County Inspection Services at (251) 574-3507. Baldwin lots go to Baldwin County Building Inspection, and Foley, Gulfport, Biloxi, and Ocean Springs each run their own city desk.

6

Step 6. Utilities, Foundation and Build

We schedule MAWSS or the local utility for taps, set the foundation to the engineered elevation, frame with a continuous load path, and update you on every active work day.

7

Step 7. Final Inspections and Walkthrough

We close every permit, walk the finished unit with you, and keep working until you sign off, backed by our 100% satisfaction guarantee.

ADU Timeline: What to Expect

Most Wise Builders ADUs finish inside our standard addition window of 2 to 5 months of construction. Design and permitting run 1 to 3 months ahead of that, so plan on 4 to 8 months from first meeting to keys for a site-built cottage.

PhaseTypical DurationWhat Can Stretch It
Feasibility, survey, and design3 to 6 weeksCovenant review, easement relocation, flood elevation certificate
Engineering and permit review3 to 8 weeksARB approval in Mobile historic districts, Board of Adjustment in Foley, ADPH septic evaluation
Utility taps and foundation2 to 4 weeksMAWSS scheduling, grinder pump install, pier foundation in flood zones
Framing through final finish8 to 16 weeksCustom finishes, impact-rated window lead times, hurricane season weather
Garage conversion (all phases)2 to 4 months typical, up to 12 with variancesZoning appeals, structural surprises in old garages
★★★★★Google Review

"Jim Brock is the best project manager ever! He constantly communicated with me about the materials, build and timeline. No stones were unturned! Exceptional work by his team."

Marcus Mitchell, Google review, November 2023

Coastal Conditions

Building an ADU for Gulf Coast Wind, Water and Termites

A backyard cottage on the Gulf Coast has to survive the same hurricane a FORTIFIED main house does. It also sits on a flatter, wetter, more termite-prone piece of ground than the house, because the house got the high spot when the lot was first built.

We engineer every ADU for the coast it lives on. That is the difference between a unit your insurer will cover and a shed with a kitchen.

Wind: ASCE 7 Design Speeds and Continuous Load Paths

Coastal Mobile and Baldwin counties fall in an ASCE 7 design wind zone of roughly 150 to 160 mph. A detached ADU has no big house to hide behind, so it gets the full load.

Every unit we build carries a continuous load path from the foundation anchors through hurricane straps to the roof deck, with impact-rated or shuttered openings. The same structure that earns FORTIFIED Gold on a roof is what keeps a cottage on its slab.

FORTIFIED Home Gold on an ADU

Because Wise Builders is a FORTIFIED roofing contractor, we can build an ADU roof to IBHS FORTIFIED Home Gold: sealed roof deck, ring-shank nails, rated openings, and a verified load path.

Alabama mandates wind-insurance discounts of 35 to 60% on the hurricane portion of the premium for FORTIFIED homes in the coastal counties of Mobile, Baldwin, and Washington. Ask your carrier how a FORTIFIED ADU is rated on your policy.

Water: FEMA Flood Zones, BFE and Freeboard

Coastal Mobile County, Dauphin Island, Gulf Shores, Orange Beach, and the Mississippi coast carry large AE and VE flood zones. A new ADU in one of those zones has to be elevated to the base flood elevation plus local freeboard, on piers or a raised slab, with an elevation certificate at the end.

That changes the foundation, the utility routing, and the price. It is also why an above-garage unit sometimes beats a cottage in a VE zone: the living space is already above the water.

Stormwater and Impervious Surface

A new slab, driveway, and walkway add impervious surface on flat lots with a high water table. Jackson County, Mississippi requires a drainage review, and several Baldwin districts count the ADU against the 35% coverage cap. We size gutters, French drains, and grading with that in mind.

Humidity, Salt Air and Formosan Termites

Nine months of cooling season, salt air, and Formosan subterranean termites are the slow-motion threats. We specify James Hardie fiber-cement siding, borate-treated framing at the slab line, termite-shielded penetrations, and a properly sized mini-split so the unit dehumidifies instead of just cooling.

Historic Districts

Inside Mobile's designated historic districts, the ADU also needs Architectural Review Board approval before permitting. That means matching roof pitch, siding profile, and window proportion to the main house. Gulfport requires matching exterior materials on every ADU, historic or not.

An architectural shingle roof replacement by Wise Builders Roofing and Renovations on the Alabama Gulf Coast
Gulf Coast
★★★★★Google Review

"We have worked with many contractors and this is the first company where work went smooth and there was no issues with the workmanship. Repaired everything the way it should be, no cutting corners."

Rachel B, Google review, May 2026

Utility rough-in for a detached ADU built by Wise Builders Roofing and Renovations on a Gulf Coast lot, showing a 100-amp sub-panel, a grinder pump basin behind the cottage, a tankless water heater, and a ductless mini-split condenser on a raised platform, all installed by licensed trades under one design-build contract.
Utilities, Systems and Materials
Utilities and Systems

ADU Utilities, Systems and Materials

Utilities are the hidden half of ADU cost. A cottage 90 feet from the street needs water, sewer, power, and conditioned air brought to it, and on a flat coastal lot the sewer usually runs the wrong direction.

We plan every utility run on the site plan before the estimate, so the taps, the trench, and the fees are all in the number.

Water and Sewer: MAWSS Taps, Laterals and Grinder Pumps

Press here to open

Inside the MAWSS service area, a new ADU that gets its own service pays a water tap, a sewer tap, capacity fees, and a meter fee. If the unit ties into the house service instead, the tap fees drop, but you lose the ability to bill a tenant separately.

Rear-yard units on flat lots often sit below the invert of the existing sewer lateral. When gravity will not carry it, we install a grinder pump and a pressure line, or extend a new lateral to the main. On septic lots, ADPH sizes the system by bedroom count and the cottage often triggers a tank or field enlargement.

Electrical: Sub-Panel or Separate Meter

Press here to open

A 600 to 1,000 square foot ADU typically needs a 100-amp sub-panel. It can be fed from the main panel, if that panel has the capacity, or from its own meter base set by Alabama Power, Baldwin EMC, Riviera Utilities, or Mississippi Power.

A separate meter lets a landlord bill the tenant directly and satisfies lenders looking for a true independent unit. A sub-meter behind the main meter is the fallback where the ordinance requires utilities through the main house, as Fairhope has historically done.

Utility and Fee Line Items

Press here to open

These are the line items that show up on a Gulf Coast ADU estimate beyond the building itself. MAWSS figures are from the 2025 fee schedule.

Line ItemTypical CostNotes
MAWSS water tap (under 1 inch)$1,180New service from the main to the meter
MAWSS sewer tap (6-inch lateral)$3,200 flatStandard depth; deeper laterals cost more
MAWSS water capacity fee (5/8-inch meter)$280One-time system capacity charge
MAWSS sewer capacity fee (5/8-inch meter)$720One-time system capacity charge
MAWSS 5/8-inch meter fee$245Meter set by MAWSS
Grinder pump and pressure line$4,500 to $9,000Rear-yard units below the lateral invert
Sewer lateral extension (gravity)$2,500 to $7,000Depends on run length and depth
ADPH septic evaluation and enlargement$1,200 to $12,000Bedroom count drives tank and field size
100-amp sub-panel and feeder$2,000 to $4,500From main panel; longer runs cost more
Separate meter base and service$2,500 to $6,000Utility fees vary by provider
Building permit fees$500 to $2,000City or county, based on valuation
Sealed engineering and elevation certificate$2,500 to $6,000Required in flood zones and for wind design

HVAC, Hot Water and Interior Systems

A detached unit cannot share the house ductwork, and it should not. These are the systems we specify by default.

01

Ductless Mini-Split Heating and Cooling

A Mitsubishi, Daikin, or Fujitsu ductless mini-split gives the ADU its own thermostat and no ductwork from the main house. High SEER2 ratings matter in a nine-month cooling season, and a single-zone unit sized to the cottage dehumidifies far better than an oversized one.

02

Tankless Water Heater

A Rinnai, Navien, or Rheem tankless heater frees a closet's worth of floor space and gives one kitchen and one bath unlimited hot water. In a 600-square-foot unit, that closet is the pantry.

03

Kitchenette vs Full Kitchen

A full kitchen with a range makes the unit a legal dwelling, which is the point of an ADU. A kitchenette with a microwave and bar sink keeps it an accessory structure, which is sometimes the only thing Fairhope or an HOA will approve. We design to whichever line you need to stay on.

Materials and Options Comparison

ComponentStandard OptionCoastal Upgrade We RecommendWhy It Matters Here
FoundationMonolithic slab, national $2,400 to $10,500Piers or pilings to BFE plus freeboardRequired in AE and VE flood zones
SidingVinylJames Hardie fiber-cement lapWind, salt air, and Gulfport's matching-material rule
WindowsStandard double-paneImpact-rated or shutteredRated openings for wind zone and FORTIFIED Gold
RoofStandard shingle deckFORTIFIED Gold sealed deck, ring-shank nailsInsurance discounts and storm survival
HVACWindow unitsDuctless mini-split, high SEER2Humidity control and independent thermostat
Water heating40-gallon tankTanklessFloor space and one-bath demand
ElectricalExtension from house circuits100-amp sub-panel or separate meterCode capacity and tenant billing
EntryShared house doorSeparate private entrance, zero-stepRequired by every ADU definition; aging in place
★★★★★Google Review

"Wise Builders recently renovated our bathroom (floor, walls, ceiling, trim, vanity, vent, outlets) and did a fantastic job! Not one time did I have to ask them to go back and fix something that was not right. They were also very helpful in finding the best solution when we encountered some unforeseen issues."

Sharon Adcock, Google review, August 2025

Prefab vs Site-Built

Prefab ADU vs Site-Built: What Works on the Coast

A prefab ADU is a factory-built unit delivered to your lot, either as a finished module or a panelized kit. It can save money on the box itself, but on the Gulf Coast the box is rarely the expensive part.

We set and finish prefab units from makers like Boxabl, Zook Cabins, DC Structures kits, and Deer Valley modular, and we build site-built cottages from scratch. Here is how they compare when the wind zone, the flood zone, and the utility trench are all real.

A finished covered porch addition built by Wise Builders Roofing and Renovations in Baldwin County, Alabama
Prefab ADU vs Site-Built

Prefab vs Site-Built Comparison

FactorPrefab or Modular ADUSite-Built ADU
Unit costRoughly $80 to $160 per sq ft before site work (national)$150 to $250 per sq ft all-in
Site work, foundation, tapsAdded on top, often $30,000 to $60,000 on the coastIncluded in the estimate
Wind ratingMust be rated for the local ASCE 7 zone; not every model isEngineered to the lot's wind speed by default
Flood zoneNeeds an engineered pier or raised foundation the factory does not supplyFoundation designed to BFE plus freeboard from the start
Design flexibilityFixed floor plans and exterior optionsMatches main house roof pitch, siding, and window proportion for ARB and Gulfport rules
TimelineFactory lead time plus 4 to 8 weeks on site2 to 5 months on site after permits
DeliveryCrane or carrier access needed to the rear yardNo access constraint beyond a concrete truck
Who is responsibleLicensed builder still needed for foundation, connection, permitsOne contract, one project manager

When Prefab Makes Sense

Prefab wins on a large, high, open lot with clear crane access, a standard rectangular unit, and no historic review. Rural Mobile County and inland Baldwin lots fit that profile more often than beach or in-town lots.

When Site-Built Wins

Site-built wins inside a flood zone, inside an ARB district, on a tight lot with no rear access, or whenever the unit has to match the main house. It also wins on any lot where the utility run and the foundation are already most of the budget, which is most coastal lots.

★★★★★Google Review

"Great people, great work and great experience. Great communication by William Fields. Work was done on schedule and exactly as stated. I will use these guys again!"

Mark Davidson, Google review, January 2026

Cost

ADU Cost on the Gulf Coast: Company Ranges and National Benchmarks

ADU cost is the total of the building, the utilities, the fees, and the engineering, and on the coast the last three can add a third to the first. Our ranges below start from the same addition pricing we use everywhere, $125 to $250 per square foot, then add the coastal line items on top.

Wise Builders ADU Cost by Type and Tier

A finished 640-square-foot detached ADU by Wise Builders Roofing and Renovations behind a Gulf Coast home, with fiber-cement siding, impact-rated windows, a FORTIFIED roof, a covered porch, and a zero-step entry, representing a typical backyard cottage priced between roughly ninety thousand and one hundred sixty thousand dollars including utility taps and wind and flood engineering.
Gulf Coast
ADU ProjectWise Builders Typical RangeWhat It Usually Covers
Garage conversion ADU (400 to 600 sq ft)$45,000 to $95,000Slab insulation, egress, full bath, compact kitchen, mini-split, infill wall, sub-panel
Junior ADU (under 500 sq ft)$40,000 to $85,000Interior reconfiguration, efficiency kitchen, bath, private exterior door
Detached ADU, standard (500 to 700 sq ft)$90,000 to $160,000Slab, framing, Hardie siding, impact windows, full kitchen and bath, mini-split, tankless, taps
Detached ADU, premium (700 to 1,000 sq ft)$150,000 to $250,000Larger footprint, custom finishes, covered porch, FORTIFIED Gold roof, separate meter
Above-garage carriage house (500 to 800 sq ft)$130,000 to $240,000New or reinforced garage structure, stair, second-floor unit, roof tie-in
Flood-zone foundation adder$15,000 to $45,000Piers or pilings to BFE plus freeboard, elevation certificate
Prefab set and finish (unit not included)$35,000 to $75,000Foundation, crane set, utility connections, permits, finish and trim

Our home addition range of $34,000 to $170,000 covers most garage conversions and standard cottages. Premium detached units and carriage houses on flood-zone lots run above it, and your fixed estimate will say exactly where yours lands.

National ADU Cost Benchmarks

These are national figures for context. They do not include coastal wind engineering, flood foundations, or Gulf Coast utility taps.

Benchmark (National)FigureSource
Detached ADU, ground-up$150 to $250 per sq ftHomeGuide 2026
600 sq ft detached cottage$90,000 to $150,000 before taps, impact fees, wind or flood upgradesHomeGuide 2026
Garage conversion ADU$50 to $200 per sq ftHomeGuide
Above-garage carriage house$200 to $500+ per sq ftNational builder surveys
Prefab or modular unit$80 to $160 per sq ft before site workManufacturer pricing
Monolithic slab foundation$2,400 to $10,500HomeGuide
Building permit fees$500 to $2,000National range; utility taps over $5,000 are the larger item
★★★★★Google Review

"They made my old house into a beautiful home. I really appreciated the way they approached it, it is like they were working on their own home."

Larry Robinson, Google review, June 2026

Financing

ADU Financing: HELOC, HomeStyle, FHA 203(k) and VA Grants

ADU financing is different from financing a kitchen because the finished unit can produce rent, and two federal programs now let that rent count toward the loan. Most Gulf Coast ADUs are still funded with home equity, and we walk you through all of it before you commit.

Wise Builders offers financing options, and we collect a 50% deposit tied in writing to specific work and materials, with the balance following written milestones you approve.

ADU Financing Options Compared

OptionHow It WorksBest ForWatch Out For
HELOC or cash-out refinanceBorrow against existing equity; no as-completed appraisal needed up frontOwners with equity who want the simplest pathVariable HELOC rates; refinance resets your first mortgage
Fannie Mae HomeStyle RenovationFinances ADU construction into a purchase or refinance; allows up to three ADUs on a one-unit property where zoning permits; lenders may disburse up to 50% at closingBuyers and owners with less equityAs-completed appraisal and lender draw schedule
FHA Standard 203(k) with ML 2023-1750% of a new ADU's projected rent counts as qualifying income; 75% of an existing ADU's rent countsOwners who need the rent to qualifyADU rent capped at 30% of total qualifying income; not for cash-out refinances
VA SAH / SHA grantsFederal grants for accessibility modifications for eligible veteransZero-step, roll-in accessible unitsGrant scope rules; Wise Builders is a registered SAH and SHA contractor
Cash with milestone payments50% deposit tied to scope, balance by approved milestonesOwners avoiding new debtTie every payment to written scope

The As-Completed Appraisal With ADU Rent

HomeStyle and 203(k) lenders order an as-completed appraisal on Fannie Mae Form 1004, with a Form 1007 comparable rent schedule. The appraiser values the property as if the ADU were finished, estimates its market rent, and confirms it is a legal, permitted unit.

That last point is why zoning comes before design in our process. An unpermitted cottage is a shed to an appraiser, no matter how nice the kitchen.

Rental Income and Short-Term Rental Rules

If rent is the plan, know the local rules first. Gulf Shores requires a business license, a rental fee, lodging tax, and a safety inspection for short-term rentals. Orange Beach stopped issuing new short-term rental licenses in RS-1 zoning. Mobile's ADU section is silent on short-term rentals, which means the general business rules apply.

★★★★★Google Review

"Wise Builders recently completed a major renovation on my home through a VA Special Adaptive Housing grant, including ramps, a roll-in shower, and expanded doorways. From the very beginning, Jim Brock, the project manager, was outstanding."

Carl Griffith, Google review, December 2025

Design Features

Design Features That Make an ADU Work for Family and for Rent

The best ADUs are designed for two lives: parents now, a tenant later. That means the unit has to be private, accessible, independent, and a real home, not a bonus room with a hot plate.

Separate Private Entrance

Nearly every ADU definition, and every appraiser and FHA underwriter, looks for a separate private entrance. We orient it away from the main house's living spaces, with its own porch light, house number, and path from the parking space.

A remodeled living room by Wise Builders Roofing and Renovations in Mobile, Alabama
Design Features

Aging-in-Place and Universal Design

Most families building for a parent ask for the same list, and it costs very little to build in from the start.

  • Zero-step entry from the parking space to the front door.
  • 36-inch doors and a 5-foot turning radius in the bath.
  • Curbless shower with a handheld and a bench.
  • Grab-bar blocking in every bathroom wall, even before the bars go up.
  • Lever hardware on doors and faucets.
  • Lighting on rocker switches at 42 inches.

The NAHB's CAPS designation, Certified Aging-in-Place Specialist, identifies builders trained in accessible remodeling. Wise Builders designs to those guidelines and to VA SAH and SHA standards, and our bathroom remodeling team builds the roll-in showers.

Full Kitchen Design in Under 100 Square Feet

A galley kitchen with a 24-inch range, an 18-inch dishwasher, and a counter-depth refrigerator does everything a tenant needs in 80 square feet. Our kitchen remodeling team designs it to the same finish level as the main house.

★★★★★Google Review

"Graham Brock and Wise Builders are incredible! Truly some of the most honest, caring, and professional people I have encountered. Highly recommend."

Nathan Poe, Google review, June 2024

Why Wise Builders

Why Homeowners Choose Wise Builders as Their ADU Builder

Wise Builders Roofing and Renovations was established in 2022 as a design-build general contractor. We draw the unit, engineer it, permit it, connect it, build it, and stand behind it in writing, all under one contract.

Owner Cody stays hands-on with the company he built, and the project manager structure puts an accountable, named person on your job every active day.

5.0
Average rating
160+
Google reviews
5-star
Facebook · Nextdoor · Trust Index

Three Promises We Make on Every ADU

01

One Point of Contact, Start to Finish

You get the same dedicated project manager from the first site walk to the final walkthrough. Experienced managers like Jim Brock, Graham Brock, Nathan Ivy, John Hagan, and William Fields handle the scheduling, the trades, the permit desk, and the utility company, so the answers come to you.

02

One Fixed Price, In Writing

Your estimate is a firm number, locked before the first shovel. Taps, fees, engineering, and construction are all in it. If the ground or the permit reveals something unforeseen, the price only moves through a written change order you approve first.

03

One Firm Timeline, Set Up Front

You know your permit date, your foundation date, and your finish date on day one. We build ARB review, Board of Adjustment cycles, and MAWSS scheduling into the timeline so they are never a surprise.

The Credentials Behind Every ADU

Trust in a second dwelling is earned with paperwork. Here is what stands behind the Wise Builders name.

CredentialWhat It Means for You
Alabama HBLB Residential Builder License #28471Required for any residential construction over $10,000 in Alabama, which includes every ADU; verify at hblb.alabama.gov
Licensed, Bonded & Insured GCYour project meets code and your liability is fully covered
BBB AccreditedVerified track record and formal complaint resolution
Atlas Pro CertifiedManufacturer-backed material and workmanship standards
FORTIFIED Roofing ContractorADU roofs can be built to IBHS FORTIFIED Gold for Alabama's mandated wind discounts
VA SAH / SHA ContractorRegistered to complete VA accessibility grant work
Two Physical OfficesTheodore headquarters and a Foley office, not a truck that leaves after storm season
5.0 Rating, 160+ ReviewsReal, verifiable proof across Google, Facebook, and Nextdoor
100% Satisfaction GuaranteeWe make it right before we call the job done

In Mississippi, residential construction over $50,000 requires a Mississippi State Board of Contractors residential builder license. Ask your project manager about licensing status for a Gulfport, Biloxi, or Ocean Springs ADU during your consultation, and never let any builder pour a foundation there without it.

★★★★★Google Review

"I highly recommend Wise Builders Roofing and Renovations for their extremely professional service from start to finish. If I could give six stars I would."

Casey Callister, Google review, December 2025

One point of contact. One fixed price. One firm timeline.
Related Services

Other Ways to Add Living Space

An ADU is one of several ways to add room. Our home remodeling hub covers all of them, and these pages go deeper on the closest alternatives.

Reviews

What Homeowners Say About Wise Builders

Wise Builders holds a 5.0 average rating across 160+ Google reviews, plus 5-star ratings on Facebook, Nextdoor, and Trust Index. The reviews are real, named, and verifiable.

We embed reviews next to the work they describe throughout this page. Here are a few more in the homeowners' own words.

5.0
Average rating
160+
Google reviews
5-star
Facebook · Nextdoor · Trust Index

Why Our Reviews Matter for an ADU

An ADU is the most paperwork-heavy residential project most homeowners ever take on. The same dedicated-project-manager system those reviews describe carries a cottage through zoning, engineering, utilities, and inspections.

Two Offices

Two Offices, One Team: Serving Mobile County, Baldwin County and the Gulf Coast

Wise Builders builds ADUs from two offices with one process. The same project managers, the same fixed estimate, and the same daily update apply on either side of the bay.

Mobile Location (Headquarters)

From Theodore we cover the City of Mobile and its historic districts, the unincorporated county where no zoning applies, and the Mississippi coast.

Service areas include Mobile, Theodore, Tillmans Corner, Dawes, Irvington, St. Elmo, Semmes, Eight Mile, Prichard, Chickasaw, Saraland, Grand Bay, Coden, Satsuma, Creola, Wilmer, Axis, Mount Vernon, Citronelle, Bayou La Batre, and Dauphin Island.

We also build in Pascagoula, Ocean Springs, Biloxi, and Gulfport on the Mississippi Gulf Coast.

Foley Location

From Foley we cover the Baldwin planning districts, the beach cities, and the Eastern Shore.

Service areas include Foley, Gulf Shores, Orange Beach, Elberta, Summerdale, Robertsdale, Loxley, Silverhill, Magnolia Springs, Bon Secour, Fairhope, Point Clear, Daphne, Spanish Fort, Lillian, Perdido Beach, Josephine, Fort Morgan, Ono Island, and Seminole.

The same project managers and the same seven-step process apply here as in Mobile County.

FAQ

Frequently Asked Questions About Building an ADU

How much does an ADU cost on the Gulf Coast?

A garage conversion ADU typically runs $45,000 to $95,000 with Wise Builders, a standard detached cottage $90,000 to $160,000, and a premium detached unit or carriage house $130,000 to $250,000. Flood-zone foundations add $15,000 to $45,000.

Nationally, HomeGuide puts a 600-square-foot cottage at $90,000 to $150,000 before taps and coastal upgrades.

How long does ADU construction take?

Plan on 4 to 8 months from first meeting to keys for a site-built detached ADU: 1 to 3 months of design and permitting, then 2 to 5 months of construction. A garage conversion usually takes 2 to 4 months, though a zoning appeal can stretch it to a year. Your project manager puts the full timeline in writing before work begins.

Can I build an ADU in the City of Mobile?

Yes. The Mobile UDC, Sec. 64-4-2(B), permits one ADU per lot by right in R-A, R-1, and R-2, capped at 1,000 square feet or 50% of the main house, whichever is less. It must have one off-street parking space, cannot sit in a recorded easement, and needs ARB approval in a historic district.

Do I need a permit for an ADU outside city limits in Mobile County?

Yes. Unincorporated Mobile County has no zoning, so there is no size cap, but every ADU still needs building, electrical, plumbing, and mechanical permits and inspections from Mobile County Inspection Services. Septic lots also need an ADPH onsite sewage evaluation, since the department sizes systems by bedroom count.

What are the ADU rules in Baldwin County and Foley?

Baldwin County permits accessory dwellings by right in most planning districts at up to 60% of the main residence, with District 21 capped at 1,200 square feet and Districts 10 and 24 limited to interior units.

Foley allows a complete independent unit at 60% of the residence, 10 feet from all lot lines and structures, two stories, with one parking space and Board of Adjustment review.

Can I build a detached ADU in Fairhope?

Historically, no. Fairhope has limited detached accessory structures to a half bath, no kitchen, and utilities through the main house, unless a variance is granted or the ordinance is updated. Most Fairhope families build an attached suite instead, which we cover on our mother-in-law suite page.

Can I use ADU rental income to qualify for financing?

Yes, under two programs. FHA Mortgagee Letter 2023-17 lets 75% of an existing ADU's rent and 50% of a new ADU's projected rent under a Standard 203(k) count toward qualifying income, capped at 30% of total income. Fannie Mae HomeStyle Renovation finances the build and allows up to three ADUs on a one-unit property where zoning permits.

Does an ADU need its own utility meter?

Not always. A separate meter lets you bill a tenant and satisfies lenders looking for an independent unit, but a 100-amp sub-panel fed from the main house is code-compliant and cheaper. Fairhope has historically required utilities through the main house.

Inside MAWSS, a separate water and sewer service runs about $5,600 in 2025 taps, capacity fees, and meter fees.

Can I build a tiny house ADU under 400 square feet?

Sometimes. IRC Appendix Q relaxes ceiling height, loft, and stair rules for houses under 400 square feet, but only where a jurisdiction has adopted it locally, and most on this coast have not.

A 400-square-foot unit built to the standard 2021 IRC is still a legal ADU everywhere the ordinance allows one, and it is the most common junior ADU size we build.

Let's Talk First

Ready to Build Your ADU? Let's Talk First

Your ADU starts with one free site walk and one honest, fixed estimate. There is nothing to pay and nothing to sign to find out what your lot can legally hold and what it would take to build.

Wise Builders Roofing and Renovations brings a dedicated project manager, a 5.0 rating across 160+ reviews, and a 100% satisfaction guarantee to every backyard cottage, garage conversion, carriage house, and junior ADU on the Gulf Coast.

Call (251) 305-7282 in Mobile County or (251) 270-5270 in Baldwin County, or request your free in-home design consultation today.

Wise Builders Roofing and Renovations, 6215 Rangeline Rd #105, Theodore, AL 36582 and 105 W Camphor Ave #100A, Foley, AL 36535, serving the Alabama and Mississippi Gulf Coast since 2022.

★★★★★Google Review

"William is great to work with. Wise Builders are extremely thorough and professional. Everything was done exactly how and when they said it would be. A++++"

Nate, Google review, May 2026

Schedule a free analysis today