Alabama GC License #60291 · Licensed · Bonded · Insured · BBB Accredited · Since 2022

Commercial Remodeling and Tenant Improvements in Mobile, AL

Opening a new location, refreshing a dated space, or turning over a suite for a new tenant? Wise Builders handles commercial remodeling and tenant improvements across Mobile and Baldwin County: walls, ceilings, lighting, flooring, paint, and finish work.

Spaces under 2,500 square feet are our sweet spot. That is where most small businesses, independent landlords, and local property managers need a contractor who moves fast and answers the phone.

We hold Alabama General Contractor License #60291. Call (251) 305-7282 to walk your space.

★★★★★ 5.0 on Google · 160+ verified reviews · Alabama GC License #60291 · Licensed, bonded & insured

Schedule a free analysis today

5.0Google rating
160+Verified reviews
100%Satisfaction guarantee
2022Serving the Gulf Coast since
Alabama GC License #60291Alabama HBLB License #28471One contract, one project managerPermits and inspections handledMobile and Baldwin County
What We Remodel

Commercial Remodels and Tenant Improvements We Build

A tenant improvement changes a leased space to fit the business using it. Most are smaller than a full build-out and happen in second-generation space.

01

Office Remodels

New private offices, a conference room, a refreshed reception area, or a full reset of a dated office. For a new office from a shell, see office build-outs.

02

Retail Retrofits

Storefront refreshes, sales floor reconfigurations, fitting rooms, flooring, and lighting for new tenants or a rebrand. See retail build-outs.

03

Restaurant and Food Service Remodels

Dining room refreshes, bar build-outs, flooring, ceilings, and interior finishes for restaurants that need to stay on schedule.

04

Second-Generation Turnovers

A suite the last tenant left behind, cleared and reset for the next one. When it needs to go back to a clean shell, see white box build-outs.

05

Walls, Ceilings and Partitions

Metal stud framing, drywall, demising walls, and acoustic ceilings to subdivide or reconfigure a space.

06

Flooring, Paint and Trim

LVP, carpet tile, and tile, commercial paint, and the finish carpentry and millwork that make a space look finished.

Who Hires Us

Most tenant improvement clients are local businesses and owners.

  • Small businesses moving into a second-generation suite.
  • Landlords turning over retail or office space between leases.
  • Law firms, insurance agencies, and professional offices customizing leased space.
  • Property managers renovating a small office or retail building.
  • Medical and dental practices refreshing an existing office. See medical and dental build-outs.

What You Get From Us

One contractor, start to finish.

  • A walk-through and a written, fixed price you can take to your landlord.
  • Drawings and permits handled under our contract.
  • One project manager from the first call to the final inspection.
  • Work scheduled around your hours if you stay open.
  • The roof handled too, through our commercial roofing team.
Investment

What a Commercial Remodel Costs on the Gulf Coast

A tenant improvement price depends on how much of the space moves. Paint and flooring is one number. Moving walls, plumbing, and ductwork is another.

Typical Gulf Coast Cost Ranges

Typical Gulf Coast ranges for a 2,000 square foot suite. Your walk-through replaces these with one fixed price.

ProjectCost per Sq FtExample TotalOn-Site Time
Paint and flooring refreshno walls moved$10 to $25$20,000 to $50,0001 to 3 weeks
Cosmetic refreshpaint, flooring, ceiling tile, LED lighting$15 to $35$30,000 to $70,0002 to 4 weeks
Partial reconfigurationsome walls moved, existing HVAC and electrical reused$35 to $60$70,000 to $120,0004 to 6 weeks
Second-generation full refreshwalls moved, HVAC re-ducted, restroom ADA upgrades$45 to $85$90,000 to $170,0005 to 8 weeks

Most tenant improvements land in the middle two rows. What pushes a job to the high end is moving plumbing, re-ducting HVAC, and bringing restrooms and entrances up to ADA.

Budget Lines Most Remodel Bids Leave Out

These are the costs that show up after the bid on most commercial remodels. We price them up front.

01

ADA Path of Travel

Alterations can require up to 20% of the cost to go toward an accessible entrance, route, and restrooms. We price it before plan review finds it.

02

Life-Safety Changes

Move a wall and you may move sprinkler heads, exit signs, emergency lights, and fire alarm devices. Those trades and their inspections are in our number.

03

After-Hours Work

If your business stays open, the loud and dusty work happens nights or weekends. We price the schedule you need, not the cheapest one.

Ranges are hard construction costs, adjusted to the Gulf Coast from national 2026 data: Cushman & Wakefield Office and Retail Fit-Out Cost Guides, Terrapin Construction Group 2026 tenant improvement and medical office cost guides, and published dental build-out guides. Furniture, equipment, IT cabling, and signage are not included unless noted.

★★★★★Google Review

"Jim Brock is the best project manager ever! He constantly communicated with me about the materials, build and timeline. No stones were unturned! Exceptional work by his team."

Marcus Mitchell, Google review, November 2023

How It Works

From Walk-Through to Certificate of Occupancy

Every commercial build-out runs through one contract and one project manager. You make decisions; we carry the schedule, the subs, the permits, and the inspections.

01

Step 1. Walk-Through and Site Survey

We walk the space with you and measure it. We check what is already there: the electrical service, HVAC capacity and duct layout, sprinkler heads, fire alarm devices, restrooms, and the slab. Those existing conditions decide the budget on a tenant improvement more than the finishes do.

02

Step 2. Written Scope and Fixed Price

You get a written scope of work with every task, allowance, and exclusion listed, plus a fixed price and a schedule. Tenants use that number to negotiate the improvement allowance with the landlord before signing.

03

Step 3. Drawings and Life-Safety Plan

Most commercial permits need drawings, and many need a life-safety plan showing exits, emergency lighting, and fire separation. We bring in the architect or engineer, carry their fee in the price, and keep the drawings tied to the budget.

04

Step 4. Permits and Landlord Approvals

We file with the department that has your address: Build Mobile inside city limits, Mobile County or Baldwin County for unincorporated addresses, and the city building department in Daphne, Fairhope, Foley, Gulf Shores, Orange Beach, and the other incorporated cities. We also handle the landlord's approval package and certificates of insurance.

05

Step 5. Build With Weekly Updates

Your project manager runs every trade and every inspection. In occupied centers we follow the landlord's rules for access, noise, and after-hours work. If the owner changes the plan or we open a wall and find a problem, it becomes a written change order you approve before we do the work.

06

Step 6. Final Inspections, Punch List and Closeout

We pass the final building and fire inspections, walk the space with you, and finish the punch list. Closeout includes lien waivers, warranties, and the paperwork your landlord and insurer ask for, so you can get your certificate of occupancy and open.

★★★★★Google Review

"Great people, great work and great experience. Great communication by William Fields. Work was done on schedule and exactly as stated. I will use these guys again!"

Mark Davidson, Google review, January 2026

Recent Project

A Two-Suite Build-Out at The Wharf in Orange Beach

Breakout Games took two second-generation suites at The Wharf and needed new layouts built inside them. Here is what went into it.

Project detailWhat we built
LocationThe Wharf, Orange Beach, Alabama
UseBreakout Games escape rooms, two suites
ScheduleContract in March 2026, closed out in June 2026
Framing11-foot metal stud partitions, a new control room, door openings widened and new headers
Ceilings and lighting2x2 acoustic ceiling grid and tile, LED recessed lights, owner-supplied specialty fixtures
Life safetyRush life-safety plan from the architect, sprinkler heads relocated, fire alarm devices moved, 7 emergency lights, a fire strobe, and panic hardware on two exits
FinishesHigh-traffic carpet, LVP, epoxy-coated concrete, themed paint, wall-mounted desk surfaces, and blocking for game components

The layout changed more than once during framing, and the life-safety review added emergency lighting and exit hardware. Every one of those changes went into a written change order, priced and signed before the crew moved a wall. That is how a build-out stays under control when the plan moves.

Recent Commercial Projects

Work From Our Recent Jobs

A two-suite tenant build-out at The Wharf in Orange Beach, and two PVC roof retrofits over metal buildings in Mobile County.

Finished escape room build-out for Breakout Games at The Wharf in Orange Beach, AL by Wise Builders
Finished game room, built inside a second-generation suite
Retail lobby with neon mural in the Breakout Games build-out at The Wharf, Orange Beach, AL by Wise Builders
Lobby and check-in at The Wharf
Wise Builders crew induction-welding PVC roof membrane to Rhinobond plates at The Homestead in Mobile, AL
Induction-welding the PVC to its plates, no screws through the membrane
Wise Builders crew and lift on a commercial roof job at The Homestead in Mobile, AL
Telehandler staging material to the roof
Rusted standing seam metal roof with skylights at Mobile SPCA in Mobile, AL before replacement
Rusted standing seam roof and skylights
Finished white PVC commercial roof at Mobile SPCA in Mobile, AL by Wise Builders
New 50 mil white PVC roof

See the full build-out on our retail build-out page and both roofs on our commercial roofing page.

Why Wise Builders

Why Business Owners and Landlords Hire Us

01

One Point of Contact

You get one project manager from the walk-through to the final inspection. Owner Cody stays involved on commercial jobs, and the office tracks submittals, change orders, and pay applications.

02

One Fixed Price, in Writing

The scope lists every task, allowance, and exclusion. The price changes only through a written change order you sign before the work happens.

03

Built for Small Commercial Spaces

Large commercial contractors often pass on spaces under 5,000 square feet. Spaces under 2,500 square feet are our sweet spot, and the job gets a dedicated project manager, not whoever is free.

The Credentials Behind Every Commercial Job

Wise Builders holds Alabama General Contractor License #60291 from the Alabama Licensing Board for General Contractors. We also hold Alabama Home Builders Licensure Board license #28471, carry general liability and workers' compensation, and are BBB accredited.

Before you sign with anyone, ask for the license number and look it up on the board's website. Ask for a certificate of insurance naming you and your landlord as additional insured. We send ours with the proposal.

★★★★★Google Review

"The contract was clear and all work was performed on schedule. A certificate of compliance was issued by a third party after inspection. It is refreshing to find a company like this."

Ronald Houle, Google review, March 2024

FAQ

Frequently Asked Questions About Commercial Remodeling

What is a tenant improvement?

A tenant improvement, or TI, is the construction that changes a leased commercial space for the business moving in: walls, ceilings, lighting, flooring, restrooms, and finishes. The landlord often pays part of it through a tenant improvement allowance.

What is a tenant improvement allowance?

A TI allowance is money the landlord puts toward your build-out, usually stated per square foot in the lease. It is negotiated before you sign. A contractor's fixed price before you sign tells you whether the allowance covers the work.

How much does a commercial remodel cost per square foot?

On the Gulf Coast, a commercial remodel or tenant improvement typically runs $10 to $85 per square foot. A paint and flooring refresh is $10 to $25, a cosmetic refresh with new ceilings and lighting $15 to $35, a partial reconfiguration $35 to $60, and a full second-generation refresh $45 to $85. For a 2,000 square foot suite, that is roughly $20,000 to $170,000.

How long does a commercial remodel take?

A paint and flooring refresh takes 1 to 3 weeks on site. A partial reconfiguration takes 4 to 6 weeks, and a full second-generation refresh 5 to 8 weeks, after the permit is issued.

Can you remodel while we stay open?

Yes. We phase the work, put up dust protection, and schedule loud or messy work for nights and weekends when needed. We plan the schedule around your hours before we start.

Do commercial remodels need permits in Mobile and Baldwin County?

Most do. Moving walls, electrical, plumbing, HVAC, and sprinkler or fire alarm changes all need permits and inspections. We file with the city or county that has your address and schedule every inspection.

What is second-generation space?

Second-generation space was built out for a previous tenant. Reusing its walls, restrooms, HVAC, and ceilings usually costs far less than building from a dark shell.

Let's Talk First

Ready to Remodel Your Space?

Your remodel starts with a walk-through and a written, fixed price. There is nothing to pay and nothing to sign to find out what your space will take.

Wise Builders Roofing and Renovations holds Alabama General Contractor License #60291 and brings one project manager, one written scope, and one fixed price to every commercial job in Mobile and Baldwin County.

Call our Mobile headquarters at (251) 305-7282 or our Foley office at (251) 270-5270, or send the form and we will set a walk-through of your space.

Wise Builders Roofing and Renovations, 6215 Rangeline Rd #105, Theodore, AL 36582 and 105 W Camphor Ave #100A, Foley, AL 36535.

★★★★★Google Review

"William is great to work with. Wise Builders are extremely thorough and professional. Everything was done exactly how and when they said it would be. A++++"

Nate, Google review, May 2026

Schedule a free analysis today