This primary bath had a fiberglass garden tub, a glass shower with a step-over curb, and a builder-grade vanity. We took it to the slab and rebuilt it as an open, bright primary bath that’s easy to use every day.
Project at a glance
- Location: West Mobile, Mobile County, AL
- Construction: about 7 weeks, mid-March to early May 2026
- Before construction: design, scope and permitting, handled by our team
- Managed by: one dedicated Wise Builders project manager, start to finish
- Scope: full primary bathroom remodel, toilet room and walk-in closet
The shower
We gutted the room, re-poured the slab to slope the new shower floor, and reframed the walls. The tub and the glass shower came out. In their place: a curbless walk-in tile shower with a built-in bench, a handheld shower on a slide bar, and grab bars. Large-format tile runs across the floor and up the shower walls, with hex tile on the shower floor for grip.




Vanity and makeup counter
A new floating vanity with a marble-look top and open space underneath, plus a separate sit-down makeup counter under the window. LED mirrors light both stations, and fresh paint ties the room together.
Toilet room and closet
The toilet sat in a narrow closet behind a door. We opened it up to the main bath and added grab bars. The walk-in closet got a wider opening and new wire shelving.


Planning a bathroom remodel in Mobile?
From a single bath to a full primary suite, we design it, permit it and build it with one project manager from start to finish. Book a free in-home consultation.
Related: Bathroom remodeling in Mobile · Bathroom remodeling · Our Mobile office